CB Shield

Upgrades made to Halton Region’s Burloak Water Purification Plant

0

By Austin Kanagasuriam

Associated Engineering was retained for the design and construction services for replacing the existing filter membranes, concrete tank linings, large diameter butterfly valves, and SCADA system upgrades at the Region of Halton’s Burloak Water Purification Plant.

Multiple factors impacted the project, including the COVID-19 pandemic, which resulted in the need to implement and follow greater safety protocols. Read the full article in ES&E Magazine’s June 2022 issue:

Force-Flow-Banner

Subscribe to our Newsletter!

The latest environmental engineering news direct to your inbox. You can unsubscribe at any time.

LEAVE A REPLY

Please enter your comment!
Please enter your name here