
By Richard Simpson
Under Canada’s Fisheries Act, any activity that causes fish mortality or harmful alteration, disruption, or destruction of fish habitat requires a Fisheries Act Authorization (FAA) obtained from Fisheries and Oceans Canada. Securing an FAA is often unpredictable and time-consuming, creating significant risks for project schedules and budgets.
Offsetting, which involves restoring or creating fish habitat to compensate for project impacts, is one of the most complex components of the FAA process. Traditional approaches require contractors, or consultants, to identify suitable sites, design and construct restoration measures, and manage long-term monitoring and maintenance. This process is resource-intensive, highly uncertain, and often results in delays, cost overruns, and inconsistent ecological outcomes.
To address these challenges, Alberta Transportation and Economic Corridors (ATEC) and Associated Engineering (AE) introduced an innovative third-party offsetting model. This approach was successfully implemented on the Stu Hart Memorial Bridge replacement on the West Calgary Ring Road and the Ivor Strong Bridge twinning, as part of Deerfoot Trail Improvements.
Subscribe to our Newsletter!
The latest environmental engineering news direct to your inbox. You can unsubscribe at any time.
Instead of consultants and contractors managing offsetting obligations, ATEC and AE partnered with Freshwater Conservation Canada (FCC), an environmental non-governmental organization (ENGO) specializing in aquatic restoration. FCC assumed full responsibility for all aspects of the offsetting. This included identifying offsetting sites, designing and implementing restoration measures, negotiating regulatory approvals, and conducting long-term monitoring and maintenance.
On the Stu Hart Memorial Bridge replacement project, the work required large temporary construction berms within the Elbow River at a critical habitat location for bull trout, which is a federally listed threatened species.
As a design-bid-build project, AE was responsible for obtaining permits, and the contractor would traditionally be responsible for following the conditions set out in those permits, including offsetting. However, FCC used their catalogue of potential offsetting locations, developed a comprehensive offsetting plan and negotiated its approval with Fisheries and Oceans Canada.

Once accepted, the offsetting plan was included in the Fisheries Act Authorization application. Therefore, the contractor had no obligations to be involved in any part of the project offsetting requirements.
The third-party offsetting model is designed for seamless integration into current transportation systems and offers exceptional flexibility for future applications. With successful implementation across two distinct procurement models, design-bid-build and design-build, the model demonstrates adaptability to diverse project delivery frameworks.
Climate resilience and sustainability are increasingly central to infrastructure planning, and this model addresses both by prioritizing ecological integrity and reducing carbon-intensive activities associated with traditional offsetting. By leveraging Freshwater Conservation Canada’s expertise and restoration sites, the model streamlined regulatory reviews, reduced costs, reduced risk, and delivered superior ecological outcomes.
The model’s scalability further enhances its future applicability. It can be deployed across regions and project types, from bridge replacements to water intakes, without significant modification. Financial predictability and risk reduction make it attractive for public agencies seeking cost-effective solutions under tightening budgets.
The model also accommodates changing regulatory requirements and societal expectations for environmental stewardship. As conservation priorities evolve, ENGOs can adjust restoration strategies, without imposing additional burdens on project owners or contractors. This adaptability ensures that offsetting remains effective and relevant in the face of emerging challenges, such as climate change, habitat fragmentation, and protecting species at risk.
Richard Simpson is with Associated Engineering. Email: simpsonr@ae.ca
This article appeared in the October print edition of Environmental Science & Engineering Magazine.






