Wastewater treatment plant installs prefabricated modular insulated floating tank cover system

0

As a result of increased demands on the 430 m³/day facility in St. Jacobs, Ont., upgrades were necessary for it to run as efficiently as possible with minimal downtime. It took only three days to install the panels of the prefabricated modular insulated floating cover system, while the plant was kept in operation.

Read the full article in ES&E Magazine’s February 2021 issue:

Subscribe to our Newsletter!

The latest environmental engineering news direct to your inbox. You can unsubscribe at any time.

LEAVE A REPLY

Please enter your comment!
Please enter your name here