Force-Flow-Banner

Study identifies wastewater management strategy for western Saskatchewan

0

The design and construction of a wastewater management system includes two new sewage pumping stations; 32 kilometres of 100 mm, 200 mm and 250 mm high-density polyethylene wastewater forcemains; two new truck dump stations; a new booster station; and a new aerated lagoon to treat wastewater from the region.

Read the full article in ES&E Magazine’s February 2021 issue:

CB Shield

Subscribe to our Newsletter!

The latest environmental engineering news direct to your inbox. You can unsubscribe at any time.

LEAVE A REPLY

Please enter your comment!
Please enter your name here