Small town chooses prefabricated wastewater lift stations

0

The town of Herbert hired Stantec Consulting to identify the best replacement solution for its two aging wastewater lift stations. However, the town no longer had the design parameters for the existing stations, which originally went online sometime in the late 20th century.

Read the full article in ES&E Magazine’s December 2021 issue:

Subscribe to our Newsletter!

The latest environmental engineering news direct to your inbox. You can unsubscribe at any time.

LEAVE A REPLY

Please enter your comment!
Please enter your name here